GUILDPRIME SPECIALIST CONTRACTS
Guildprime quickly progressed from offering 'shop fitting' services to providing a diverse range of unrivalled specialist contract services. The company now boasts a team of skilled professionals and enjoys an enviable reputation for quality, service delivery and year-on-year growth. Testament to the company's success is their high level of client retention, they are proud to have worked with a number of prestigious clients and luxury brands for over 20 years.
GUILDPRIME SPECIALIST CONTRACTS
Industry:
Building Material Construction
Founded:
1985-01-01
Address:
Great Burstead, Essex, United Kingdom
Country:
United Kingdom
Website Url:
http://www.guildprime.com
Total Employee:
101+
Status:
Active
Contact:
+44 (0)1277 637888
Email Addresses:
[email protected]
Technology used in webpage:
Viewport Meta IPhone / Mobile Compatible SPF SSL By Default Google Font API Google Analytics Apple Mobile Web Clips Icon Google Tag Manager Content Delivery Network Google Universal Analytics
Similar Organizations
Anton Steininger
Anton Steininger is a construction company, that offers civil engineering, turnkey residential and commercial construction services.
Germabouw
Germabouw specializes in assembling and renting a wide range of scaffolding for various construction projects.
Official Site Inspections
http://www.guildprime.com
- Host name: cp164172.hpdns.net
- IP address: 91.238.164.172
- Location: United Kingdom
- Latitude: 51.4964
- Longitude: -0.1224
- Timezone: Europe/London

More informations about "Guildprime Specialist Contracts"
Oak Hill Parkway over halfway to finish line | Community Impact
Jun 4, 2025 The project is over halfway to completion, with a substantial completion date set for mid-2026, TxDOT project manager Christiana Astarita said.See details»
Oak Hill Parkway - Texas Department of Transportation
We are committed to keeping you up to date about Oak Hill Parkway.See details»
TxDOT Reaches Halfway Mark on Oak Hill Parkway Project, โฆ
In southwest Austin, Texas, the Oak Hill Parkway Project has passed the halfway mark in its construction and is on track for substantial completion in 2026. The massive Texas โฆSee details»
Oak Hill Parkway Project halfway complete, says TxDOT
Dec 8, 2024 The Oak Hill Parkway Project is now halfway complete and TxDOT says it is taking big steps to alleviate traffic now before construction is finished.See details»
TxDOT Oak Hill Parkway โ AtkinsRéalis
The 7-mile project, which is expected to be completed in 2026, includes the construction of three US 290 mainlanes in each direction for through traffic, as well as two-to-three frontage road โฆSee details»
Oak Hill Parkway project causes frustration for some drivers | kvue.com
May 21, 2024 The Oak Hill Parkway project is expected to make major strides through the rest of 2024 into the winter months, but full completion isn't expected until 2026.See details»
Oak Hill Parkway - Movability
Oak Hill Parkway TxDOT is building an upgraded highway at the intersection of US 290 and SH 71 consisting of 2-to-3 non-stop US 290 mainlanes for through traffic in each direction, as well โฆSee details»
US 290 West projects and studies - Texas Department of Transportation
Oak Hill Parkway TxDOT is widening US 290 to include two-to-three non-stop mainlanes in each direction for through traffic as well as two-to-three frontage road lanes in each direction. The โฆSee details»
Oak Hill Parkway - balfourbeattyus.com
Additional project components include bicycle and pedestrian accommodations along the entire corridor, cross-street intersection improvements, U-turn lanes, upstream water detention, โฆSee details»
Major activity - Texas Department of Transportation
The eastern bridge will also allow the drivers to make a west-to-east U-turn at the US 290/SH71 Interchange. This configuration is expected to be in place until project completion in 2026. All โฆSee details»
TxDOT Oak Hill Parkway: Fluor Project on US 290 & SH 71
The Oak Hill Parkway project is part of TxDOTโs long-term plan to promote congestion management in one of the stateโs most congested corridors. When completed, the project will โฆSee details»
New bridge opens at RM 1826, Hwy. 290 as Oak Hill Parkway โฆ
Apr 3, 2025 Though construction is expected through 2026, progress can be seen along Oak Hill Parkway as crews opened access to a new bridge at the juncture of RM 1826 and Hwy. 290 in โฆSee details»
Balfour Beatty successfully places first beams to support bridge ...
Jun 24, 2022 Additional project components include bicycle and pedestrian accommodations along the entire corridor, cross-street intersection improvements, U-turn lanes, upstream water โฆSee details»
Construction - Texas Department of Transportation
Construction Construction is ongoing through 2026 Major activity Stay up-to-date with major activity along the corridor.See details»
Oak Hill Parkway Project: What to expect at US 290, SH 71 โฆ
Aug 3, 2023 Oak Hill Parkway construction hits 1-year mark in Southwest Austin After a little over 12 months into the five-year-long project, elements of the new Oak Hill Parkway are โฆSee details»
Oak Hill Parkway Project
Next steps Negotiate final terms of the design-build contract Federal Highway Administration concurrence with final award Final award and execution anticipated in Summer 2020 โฆSee details»
US 290 from Oak Hill to Dripping Springs Environmental Study
โข Oak Hill Parkway construction is in progress, with completion anticipated in 2026. The project is widening US 290 to an access-controlled facility, adding lanes for drivers traveling through โฆSee details»
Project history - Texas Department of Transportation
The history of Oak Hill Parkway The intersection of US 290 and SH 71 has long been identified as a heavily congested intersection in need of solutions. In fact, improvements for this โฆSee details»
Oak Hill Parkway - Texas Department of Transportation
TxDOT evaluated the design, construction, operation and maintenance of a project to reconstruct and widen US 290 from approximately the east end of Circle Drive to Loop 1 (MoPac) and SH โฆSee details»
Newsletter - Texas Department of Transportation
Feb 22, 2024 As we move into the summer months, construction on Oak Hill Parkway continues to advance steadily. This phase of the project includes key construction activities and traffic โฆSee details»