RAIL COMPLETE

rail-complete-logo

Railcomplete AS was incorporated in 2015 through a fission from Anacon Rådgivning AS, a company having experience since 1990 with Norwegian railway infrastructure. They select developers who excel at both mathematics and physics. Their team also has long experience from infrastructure planning, procurement, construction and documentation for the Norwegian Rail Administration, Bane NOR SF (former Jernbaneverket). RailCOMPLETE is a global product, based on technology developed in Norway. Railcomplete AS has offices in Sandvika, Bærum, close to Oslo, Norway.

#People #Website #More

RAIL COMPLETE

Social Links:

Industry:
Information Technology Infrastructure Railroad Software

Founded:
2015-01-01

Address:
Sandvika, Akershus, Norway

Country:
Norway

Website Url:
http://www.railcomplete.com

Total Employee:
1+

Status:
Active

Contact:
47 48 11 00 07

Email Addresses:
[email protected]

Technology used in webpage:
Japanese Yen 10 To 14 CcTLD Redirects


Current Employees Featured

claus-alrik-feyling_image

Claus Alrik Feyling
Claus Alrik Feyling CEO @ Rail Complete
CEO

Official Site Inspections

http://www.railcomplete.com

  • Host name: 145.14.154.203
  • IP address: 145.14.154.203
  • Location: United States
  • Latitude: 37.751
  • Longitude: -97.822
  • Timezone: America/Chicago

Loading ...

More informations about "Rail Complete"

RailCOMPLETE® - FRONT PAGE - Bringing BIM to your railway …

We started the development of RailCOMPLETE because we are passionate about modernizing the railway industry and because we firmly believe that this is the best way to reach an …See details»

ABOUT US - Bringing BIM to your railway projects

RailCOMPLETE is a global product, based on technology developed in Norway. Railcomplete AS has offices at Lysaker in Bærum, close to Oslo, Norway.See details»

RailCOMPLETE - railML.org (EN)

RailCOMPLETE® is a product of Railcomplete AS (Norway). RailCOMPLETE provides substantial time and cost savings when building and updating detailed infrastructure models; …See details»

READ MORE - Welcome - Bringing BIM to your railway projects

RailCOMPLETE turns your model into an electronic relay stick which enables owners, designers, contractors and testers to organize and edit railway data as well as produce tables, 2D …See details»

Railcomplete AS - railML.org (EN)

Railcomplete AS provides tools for the engineering of wayside infrastructure in railway projects. Visit us at www.railcomplete.com. Railcomplete AS was founded through fission in 2015. The …See details»

Railcomplete AS - LinkedIn

• RailCOMPLETE saves time and cost • RailCOMPLETE boosts data quality • Suits early planning stages to operations • Manage large railway infrastructure computer models • See your project...See details»

RailCOMPLETE® - Railway Technology

Railcomplete AS develops RailCOMPLETE®, an AutoCAD® building information modelling (BIM) tool for railway infrastructure planning. RailCOMPLETE is designed to facilitate tasks performed while planning railway infrastructure …See details»

Rail Complete - Company profile | ensun

RailCOMPLETE is a global product, based on technology developed in Norway. Railcomplete AS has offices at Lysaker in Bærum, close to Oslo, Norway. RailCOMPLETE is an AutoCAD® …See details»

Railcomplete A.S. - RAILMARKET.com

RailCOMPLETE is an AutoCAD® plug-in for the design of railway systems with high level of detail. With low effort you will produce high quality models in 2D and 3D, with drawings and reports. Not using RAILVIS Platform yet? Rent a …See details»

PRODUCT - Bringing BIM to your railway projects

Nov 8, 2022 · RailCOMPLETE® simplifies the railway infrastructure planning process. Complex BIM data are held in one place, to be re-used at all steps of the planning and construction process. The use of RailCOMPLETE…See details»

RailCOMPLETE® - Planning tool for railway assets - Eurailpress

Aug 18, 2022 · Railcomplete is an AutoCAD® plug-in for planning railway systems with a high level of detail. High-quality models can be developed in 2D and 3D with little effort. …See details»

RailCOMPLETE - Facebook

RailCOMPLETE® is an AutoCAD-based railway wayside infrastructure planning software - Empowering rai.See details»

Drawing with SAT: four methods and A tool for producing railway ...

Oct 20, 2021 · We show how to encode schematic railway drawings as an optimization problem over Boolean and numerical domains, using combinations of unary number encoding, lazy …See details»

RailCOMPLETE® Railway Model Design Software

RailCOMPLETE is a computer-aided design (CAD) software used in designing railway systems at a high level of detail. The AutoCAD® plug-in allows high-quality 2D and 3D models to be …See details»

RailCOMPLETE and tutorials download

You may freely obtain the RailCOMPLETE software from our download pages. RailCOMPLETE will install with a time-limited license which runs for about a week. Thereafter, please follow the …See details»

Rule-Based Consistency Checking of Railway Infrastructure Designs

Jun 1, 2016 · We employ a variant of Datalog and use the standardized "railway markup language" railML as basis and exchange format for the formalization. We describe a prototype …See details»

Rule-Based Incremental Verification Tools Applied to Railway …

Nov 8, 2016 · The tool is integrated into the RailCOMPLETE ® software, a professional railway CAD program for producing and editing railML representations of railway infrastructure. The …See details»

Highlights of the RailCOMPLETE® development – A BIM success …

Oct 23, 2023 · Since the beginnings in 2015 RailCOMPLETE has been constantly expanded with new functions. Today, the tool has a wide range of functions that partially automate the …See details»

RailCOMPLETE - https://railcomplete.com/using-railcomplete

Https://railcomplete.com/using-railcomplete-and-ifc-bim-modeling-to-facilitate-railway-operations-and-maintenance/See details»

10 reasons to choose RailCOMPLETE

RailCOMPLETE® makes railway wayside infrastructure planning easy. Complex data is gathered in one place and is ready for cross-disciplinary use at all steps of the planning and …See details»