TJ ASSOCIATES
TJ ASSOCIATES is a human resources firm that provides customers with efficient talent recruitment and employment services.
TJ ASSOCIATES
Social Links:
Industry:
Employment Human Resources Recruiting
Founded:
2014-01-01
Address:
Shanghai, Shanghai, China
Country:
China
Website Url:
http://www.tj-associates.cn
Total Employee:
51+
Status:
Active
Contact:
86-21-61646579
Email Addresses:
[email protected]
Similar Organizations
Avance
Avance is a human resources company that provides recruiting and employment services for organizations.
Yanzhi Zhaopin
Yanzhi Zhaopin is a mobile internet company that provides short video recruitment and employment services.
Current Employees Featured
Founder
Official Site Inspections
http://www.tj-associates.cn
- Host name: 101.132.243.103
- IP address: 101.132.243.103
- Location: Hangzhou China
- Latitude: 30.294
- Longitude: 120.1619
- Timezone: Asia/Shanghai

More informations about "TJ ASSOCIATES"
Burj Khalifa - Wikipedia
Burj Khalifa was designed to be the centerpiece of a large-scale, mixed-use development to include 30,000 homes, [16] nine hotels (including The Address Downtown Dubai), 3 hectares …See details»
What was the duration of time taken to construct the Burj Khalifa ...
May 9, 2023 The construction of the Burj Khalifa began on September 21, 2004, and was completed on January 4, 2010, taking a total of 2,717 days to finish. The project was managed …See details»
Burj Khalifa: Construction of the Tallest Structure in the World
Reading time: 1 minute The Burj Khalifa is the world's tallest structure with a height of 828 m and has a total of 163 floors. Famous as a mixed-use development tower with a total floor area of …See details»
How Long Did it Take to Build Burj Khalifa - Enjoy Travel
Soaring a stomach-churning 828 metres (2, 716-feet) high, the Burj Khalifa isn’t just the world’s tallest building, it’s also 60% taller than the world’s second-tallest building. That’s quite the …See details»
Burj Khalifa | Height, Architect, Top Floor, & Facts | Britannica
Sep 26, 2025 Burj Khalifa, mixed-use skyscraper in Dubai, United Arab Emirates, that is the world’s tallest building, according to all three of the main criteria by which such buildings are …See details»
How Many Years Did it Take to Build Burj Khalifa? | in Dubai Mall
May 13, 2025 How many floors in Burj Khalifa? It has 160 floors and features the highest observation deck globally. Are you curious about its construction time? The Burj Khalifa, the …See details»
Burj Khalifa Facts and Information - The Tower Info
This article provides comprehensive facts and information about the Burj Khalifa, covering its height, uses, architectural design, construction timeline, tips for visiting the observation decks, …See details»
Iconic construction projects – Burj Khalifa
The 828-metre Burj Khalifa skyscraper in Dubai is the world’s tallest building. Composed of 160 storeys, it is also the tallest free-standing structure in the world. Find out how this incredible …See details»
Burj Khalifa Tower Making Process & Structure
Discover the story behind The Tower’s creation. Explore the innovative design, construction milestones, and engineering marvels that brought this iconic structure to life.See details»
When Did Burj Khalifa Construction Start?
Aug 25, 2024 The Burj Khalifa’s construction is a remarkable story of vision, innovation, and determination. From its inception to its grand opening, the project faced numerous challenges, …See details»
Burj Khalifa - Looking at the World's Tallest Building in Dubai
Sep 9, 2022 The Burj Khalifa (the world’s tallest building) and the Dubai skyline; imran shahabuddin, CC BY 2.0, via Wikimedia Commons Construction The Construction work on the …See details»
How Was Burj Khalifa Built? - PA | Architecture & Technology
Sep 15, 2024 The total cost of construction was an estimated $1.5 billion, a massive investment that has paid dividends for Dubai in terms of tourism, real estate, and global recognition. But …See details»
How Long Did Burj Khalifa Take To Build - themost10.com
The Burj Khalifa, standing at a towering height of 828 meters, is not only the tallest building in the world but also a symbol of human achievement and innovation. The construction of this iconic …See details»
What was the duration of the construction of Burj Khalifa?
May 10, 2023 The construction of Burj Khalifa took a total of six years, from 2004 to 2010, and involved over 12,000 workers. The exact duration of the project was 2,722 days, or …See details»
Quick History of the Burj Khalifa - DoTravel Magazine
Mar 29, 2023 The Burj Khalifa's height is a testament to modern engineering and construction technology advances. FAQs When is the best time to visit the Burj Khalifa? The best time to …See details»
Burj Khalifa: A Guide to the World’s Tallest Building
These astonishing records firmly establish the Burj Khalifa as a monument of absolute engineering supremacy. Dubai intentionally set out to break all possible limits with this …See details»
How Long Did The Burj Dubai Take To Build? (Question)
The Burj Khalifa, which was under construction at the time, was photographed in April 2005. The project had become a 30-floor highrise building from a Y-shape foundation structure in less …See details»
How Burj Khalifa was built - Commercial Interior Design
Jul 4, 2023 Burj Khalifa was an international collaboration between more than 60 contracting and consulting companies worldwide. At the peak of construction, over 12,000 workers and …See details»
At what time was the construction of Burj Khalifa completed?
May 10, 2023 The construction of Burj Khalifa was completed on January 4, 2010, after six years of work.See details»
When Was Burj Dubai Built? - travelasker.com
Jan 27, 2024 Burj Dubai, now known as Burj Khalifa, is the tallest building in the world. It is located in Dubai, United Arab Emirates, and stands at an impressive height of 828 meters …See details»