VGL GROUP

vgl-group-logo

VGL Group Sp. z o.o. is the the Polish freight forwarding and logistics operator. VGL Group operates in several segments of the transport & logistics service market and employs about 450 people. The Company forwards about 55,000 TEU and processes over 90,000 FTL orders per year. It also conducts logistic operations on 12,000 sqm of rented warehouse storage area. The Group focuses also on retail and consumer products segments, providing complex supply management services to its key clients. VGL’s diversified customer base includes over 4,500 clients. The Group operates through 17 locations in 14 cities (Hong-Kong, Ningbo, Shanghai).

#SimilarOrganizations #People #Financial #Website #More

VGL GROUP

Social Links:

Industry:
Logistics Transportation

Founded:
2000-01-01

Address:
Gdynia, Pomorskie, Poland

Country:
Poland

Website Url:
http://www.vgl-group.com

Total Employee:
251+

Status:
Active

Contact:
+48 58 735 95 00

Technology used in webpage:
IPhone / Mobile Compatible Viewport Meta SPF Apple Mobile Web Clips Icon Google Font API Google Tag Manager WordPress Google Analytics SSL By Default Global Site Tag


Similar Organizations

ace-logistics-latvia-sia-logo

ACE Logistics Latvia SIA

ACE Logistics Latvia SIA is a company offering freight forwarding and logistics services.

Current Employees Featured

anna-raczkiewicz_image

Anna Raczkiewicz
Anna Raczkiewicz CEO Sea-Air-Rail @ VGL GROUP
CEO Sea-Air-Rail
2019-03-01

marek-Ładzikowski_image

Marek Ładzikowski
Marek Ładzikowski CEO Road @ VGL GROUP
CEO Road
2015-09-01

marek-Ładzikowski_image

Marek Ładzikowski
Marek Ładzikowski Managing Director/ CEO @ VGL GROUP
Managing Director/ CEO
2012-06-01

Investors List

21-investimenti_image

21 Invest

21 Invest investment in Private Equity Round - VGL GROUP

Official Site Inspections

http://www.vgl-group.com

Unable to get host informations!!!

Loading ...

More informations about "VGL GROUP"

Burj Khalifa - Wikipedia

Burj Khalifa was designed to be the centerpiece of a large-scale, mixed-use development to include 30,000 homes, [16] nine hotels (including The Address Downtown Dubai), 3 hectares …See details»

When Was Burj Dubai Built? - travelasker.com

Jan 27, 2024 Burj Dubai, now known as Burj Khalifa, is the tallest building in the world. It is located in Dubai, United Arab Emirates, and stands at an impressive height of 828 meters …See details»

Burj Khalifa: Construction of the Tallest Structure in the World

Reading time: 1 minute The Burj Khalifa is the world's tallest structure with a height of 828 m and has a total of 163 floors. Famous as a mixed-use development tower with a total floor area of …See details»

Burj Khalifa Facts and Information - The Tower Info

This article provides comprehensive facts and information about the Burj Khalifa, covering its height, uses, architectural design, construction timeline, tips for visiting the observation decks, …See details»

Burj Khalifa Tower Making Process & Structure

Discover the story behind The Tower’s creation. Explore the innovative design, construction milestones, and engineering marvels that brought this iconic structure to life.See details»

Burj Khalifa | Height, Architect, Top Floor, & Facts | Britannica

Oct 2, 2025 Burj Khalifa, mixed-use skyscraper in Dubai, United Arab Emirates, that is the world’s tallest building, according to all three of the main criteria by which such buildings are …See details»

How Long Did it Take to Build Burj Khalifa - Enjoy Travel

Soaring a stomach-churning 828 metres (2, 716-feet) high, the Burj Khalifa isn’t just the world’s tallest building, it’s also 60% taller than the world’s second-tallest building. That’s quite the …See details»

Iconic construction projects – Burj Khalifa

The 828-metre Burj Khalifa skyscraper in Dubai is the world’s tallest building. Composed of 160 storeys, it is also the tallest free-standing structure in the world. Find out how this incredible …See details»

Design, Construction and Structural Details of Burj al Khalifa ...

Mar 30, 2017 The 280,000 m 2 (3,000,000 ft 2) reinforced concrete multi-use Burj Dubai tower is utilized for retail, a Giorgio Armani Hotel, residential and office. As with all super-tall projects, …See details»

How Was Burj Khalifa Built? - PA | Architecture and Technology

Sep 15, 2024 The total cost of construction was an estimated $1.5 billion, a massive investment that has paid dividends for Dubai in terms of tourism, real estate, and global recognition. But …See details»

When Did Burj Khalifa Construction Start?

Aug 25, 2024 The Burj Khalifa’s construction is a remarkable story of vision, innovation, and determination. From its inception to its grand opening, the project faced numerous challenges, …See details»

The construction of the Burj Khalifa: an architectural and …

Dec 12, 2023 The Burj Khalifa, a majestic icon dominating the Dubai skyline, is much more than just a skyscraper. It embodies boldness, vision and human ingenuity. This titanic edifice, …See details»

At what time was the construction of Burj Khalifa completed?

May 10, 2023 The construction of Burj Khalifa was completed on January 4, 2010, after six years of work.See details»

Burj Khalifa: The Story Behind World's Tallest Tower

Jul 2, 2025 Whether you’re seeing it for the first time or learning about its journey, the Burj Khalifa isn’t just the tallest building in the world. It’s a story told in steel, glass, and sky.See details»

Quick History of the Burj Khalifa - DoTravel Magazine

Mar 29, 2023 The Burj Khalifa's height is a testament to modern engineering and construction technology advances. FAQs When is the best time to visit the Burj Khalifa? The best time to …See details»

Structural Details of Burj Khalifa - build-construct.com

Aug 17, 2025 The Burj Khalifa, the tallest building in the world, stands as a remarkable feat of engineering and architecture. Inaugurated on January 4, 2010, the tower reaches a towering …See details»

Burj Khalifa: Rare old pictures showing how it became the world's ...

Nov 14, 2025 Once upon a time (not so long ago), the Burj was just concrete under construction – a very different sight from today. It’s also fascinating to see just how much Downtown Dubai …See details»

Burj Khalifa - Khaleej Times

Jan 4, 2010 Beyond its height and the tallest service elevator, the Burj Khalifa also holds records for the highest number of stories (163) and the highest occupied floor.See details»

How Long Did The Burj Dubai Take To Build? (Question)

The Burj Khalifa, which was under construction at the time, was photographed in April 2005. The project had become a 30-floor highrise building from a Y-shape foundation structure in less …See details»

What was the duration of time taken to construct the Burj Khalifa ...

May 9, 2023 The construction of the Burj Khalifa began on September 21, 2004, and was completed on January 4, 2010, taking a total of 2,717 days to finish. The project was managed …See details»

linkstock.net © 2022. All rights reserved